Pingyilu Industrial Park, Nanguzhuangying Village, Ansu Town, Xushui District, Baoding City
Globe valve installation precautions
2024-11-04
When installing the stop valve, pay attention to the following points:
First of all, ensure that the valve is firmly connected with the pipeline to avoid leakage. Secondly, before installation, check whether the inside and outside of the valve is damaged or defective to ensure normal operation. Furthermore, the installation direction of the stop valve needs to ensure that the fluid flows from the bottom of the valve to the top, can not be installed.
The handle or transmission mechanism of the valve should be convenient to operate and ensure safety. The installation length shall be as specified to ensure sufficient space for operation. The stop valve shall be tested after installation to ensure that there is no leakage and the switch is flexible. At the same time, pay attention to compliance with safety regulations, and install by professionals to ensure safe and effective use.
Key words:
Hot News